FUSION AEROSPACE-GRADE PVD // TECHNICAL OPERATIONS DOSSIER CHAMBER: 6.80 m³ | VACUUM TRAIN: 72 kW | BASE TARGET: 1.0×10⁻² Pa
MISSION OPERATIONS MANUAL // REV 2.0

1.9 m × 2.4 m Cathodic Arc PVD System

Precision engineering dossier for the Shenyang Youbida KT-1200 high-vacuum diffusion pump, 2 × 7.5 kW Roots boosters, 6 × 70 L/s (5.5 kW) Rotary Vane backing train, and 22 × SASH Arc Sources.

Chamber Envelope
Ø1.9m × 2.4m
6.80 m³ Volume
High Vacuum
50,000 L/s
KT-1200 (5×10⁻⁵ Pa)
Oil Charge
22 Liters
HFV-K3 (230–260°C)
KT-1200 Heater
24.0 kW
~36.5 A / ph (380V)
Cooling Water
40–50 LPM
Min 35 LPM | ≤40°C OUT
Cycle to 10⁻² Pa
~15–22 min
Hot KT-1200 Ready

01 // Vacuum, Gas & Cathodic Arc System Architecture

FIG-01 // P&ID SCHEMATIC

Complete physical and control topology matching your pit installation, Samkoon HMI (2组 dual backing groups), 4-channel MFCs (Ar / N₂ / C₂H₂), and 22-source SASH arc power rack.

PVD CHAMBER (6.8 m³) Ø1.90m × H2.40m 22 × SASH ARC SOURCES ARC1–10 + ARC1–12 Planetary Turntable (转架) Chamber Heaters (加热) 4-CH MFC GAS INLET Ar • N₂ • C₂H₂ 高阀 (HV) 24 kW HEATER KT-1200 50,000 L/s 22 L HFV-K3 230–260°C WATER: 40–50 LPM (18–25°C IN → ≤40°C OUT) Holding (维持泵) Foreline <10–15 Pa ROOTS #1 7.5 kW (~600 L/s) ROOTS #2 7.5 kW (~600 L/s) Rotary #1 (70 L/s, 5.5kW) Rotary #2 (70 L/s, 5.5kW) Rotary #3 (70 L/s, 5.5kW) Rotary #4 (70 L/s, 5.5kW) Rotary #5 (70 L/s, 5.5kW) Rotary #6 (70 L/s, 5.5kW) PURPLE uPVC EXHAUST (420 L/s, ≥DN100)

02 // KT-1200 Engineering Blueprints & Machine Spec Placard

FIG-02 // 300 DPI PRINTABLES
KT-1200 External & Internal Diagram
External Piping & Internal 4-Stage Supersonic Jets DOWNLOAD PNG
KT-1200 Machine Spec Label
Print-Ready Machine Spec Sticker (300 DPI) DOWNLOAD PNG

03 // Pump-Down Telemetry Profile (Atm → 1.0 × 10⁻² Pa)

FIG-03 // LOG-PRESSURE CURVE
TARGET 1.0×10⁻² Pa: ~18 MIN
PhasePressure EnvelopeActive Pumping TrainEstimated Time (Hot)
Phase 1: Roughing100,000 Pa → 2,000 Pa6 × 70 L/s Rotary Vane (420 L/s)~1.5 – 2.0 min
Phase 2: Roots Cut-In2,000 Pa → 5 Pa2 × 7.5 kW Roots + 6 × Rotary (~1,200 L/s)~5.0 – 8.0 min
Phase 3: High Vacuum5 Pa → 1.0 × 10⁻² PaKT-1200 (50,000 L/s, High-Vac Valve Open)~8.0 – 12.0 min

04 // Power Distribution (72 kW) & 24 kW Heater Plate Schematic

FIG-04 // 380V 3-PHASE
380V 3-PHASE BUS (50 Hz) Total Vacuum Train: 72 kW (~124.5 A) • 6× Rotary: 33 kW (~60 A) • 2× Roots: 15 kW (~28 A) • KT-1200: 24 kW (~36.5 A) SAFETY INTERLOCK TRIP Water <35 LPM OR Temp >265°C HEATER CONTACTOR Delta PID (230–260°C) + Water Flow Switch Sector A (8 kW) Sector B Sector C OHM CHECK (24 kW) Star (Y) 220V/leg: ~6.05 Ω / leg Delta (Δ) 380V/leg: ~18.05 Ω / leg Pan Ground: ∞ MΩ

05 // Cooling Water & HFV-K3 Oil Specifications

SPEC-05 // FLUIDS
ParameterOperating TargetSafety / Maintenance Limit
Oil Type & QuantityHuifeng HFV-K3 (#3 Mineral) — 22 Liters (5.5 × 4 L cans)Do NOT mix with silicone oil (275# / DC-704). Change every 3–6 months.
Boiler Oil Temp230°C – 260°COver-temp cutoff at 265°C. Cool < 60–70°C before venting.
Cooling Water Flow40 – 50 LPM (2.4 – 3.0 m³/h)Min 35 LPM; interlock must trip 24 kW heater below 35 LPM.
Water Temp & PressureInlet: 18–25°C | Pressure: 0.2–0.3 MPa (2–3 bar)Outlet must stay ≤ 35–40°C (Alarm at 45°C).

06 // Pre-Flight Launch & Shutdown Checklist

SOP-06 // OPERATOR

07 // Site-Specific Inspection Findings (From Your Photos)

AUDIT-07 // ACTION REQUIRED
1. Cracked Top Ceramic Sector on 24 kW Heater Plate: Verify coil-to-pan insulation (MΩ), balance all 3 phase resistances (~6.05 Ω Star / ~18.05 Ω Delta), and replace oxidized terminal ceramic beads before reassembly.
2. Delta Temp Controller Showing PV: no: Thermocouple is open/disconnected on the front panel unit. Confirm which controller drives the KT-1200 boiler SSR/contactor before powering the 24 kW heater.
3. Purple uPVC Exhaust Manifold & Cabinet Wiring: Ensure purple uPVC exhaust header is ≥ DN100 (110 mm) with an oil-drain trap for the 420 L/s combined rotary exhaust, and bundle loose red wires inside the Siemens PLC / Schneider relay cabinet.